Industrial Tenant Questionnaire

    Completed By







    1. Project Overview:


    Build a facilityBuy and retrofit an existing facilityLease and retrofit an existing facility

    2. Project Timeline:

    Is Lease Term tied to specific customer contract?

    YesNo

    If Yes, Is customer contract executed?

    YesNo


    3.Facility Specifications:

     

    Square Footage

     

    Minimum

    Optimal

    Office

    Production

    Warehouse

    Other

     

    Minimum

    Optimal

    Dimensions

    Ceiling clear height (in feet)

    Floor thickness (in inches)

    Doors:

    -Dock height (# required)

    Drive-in (# required)

    Rail (# required)

    Column Spacing

    Building Depth

    Truck Court Depth

    Trailer Parking Spaces (# required)

    Car Parking Spaces (# required)

    Outside Storage

    Type

    Yes/No

    Cross-Dock

    YesNo

    Rear Load

    YesNo

    Front Load

    YesNo

    YES/N0

    FACILITY REQUIREMENT

    COMMENTS

    YesNo

    Air conditioned/spot cooled production area

    YesNo

    Air-conditioned warehouse or DC

    YesNo

    Rail Served

    YesNo

    Crane(s)

    YesNo

    Food Grade

    YesNo

    Refrigerated Space

    YesNo

    Freezer Space

    YesNo

    Waste water pre-treatment

    YesNo

    Pits or trenches

    YesNo

    Machine foundations

    YesNo

    LEED Certification

    YesNo

    Other:

    4.Supply Chain Specifications:

    YesNo




    YesNo


    YesNo










    5. Labor Specifications:


    YesNo

    Job Classification

    Brief Description of Duties

    Is Position Considered:

    Number of Workers

     

     

    Unskilled

    Moderately Skilled

    Highly Skilled

    Shift 1

    Shift 2

    Shift 3

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    On a scale of 1 to 5 (1 = not important; 5 = very important) rate the following labor force characteristics in terms of their importance to your company relative to the new location:

    Quality of the labor pool

    12345

    Availability of skilled labor

    12345

    Wages of skilled workers

    12345

    Quantity of unskilled labor

    12345

    Access to vocational training

    12345

    Non-union orientation

    12345

    Other (please define)

    12345